Asbestos removal work – industrial bleach Malbin Ramat Hasharon. For Netzer Hasharon

Olenik performed the work to remove the layer of asbestos cement material in the soil at the bleach Malbin site, at the IMI site Ramat Hasharon.

The removal was performed using special heavy machinery in a careful and controlled manner, packed in special packaging for asbestos that were buried at an authorized site, while adopting all procedures mandated by the Ministry of the Environment.