Construction of a bridge for Road 12 Mount Yonah Nazareth Illit.

Construction of a bridge for Road 12 Mount Yonah Nazareth Illit.

Financial Scope

Approx. 14,000,000 ILS

Client

Ministry of Construction and Housing

Project Management Company

Arcadi Barbashtein

Project Description

As part of the project, an overpass bridge was constructed across Highway 13. The bridge has an overall width of 17 meters and an overall length of 14.5 meters.

The bridge foundations were constructed using drilled and cast-in-place piles connected by pile caps.

The abutments were cast on earth embankments using formwork.

The bridge deck was assembled from 10 pre-stressed beams supported by bearings on the abutments.

The deck slab was cast on a membrane plate and formwork, with steel railings installed along both edges of the bridge deck.