Project Description
Within this project, an upgrade of Road No. 444, "Tayibe Crossing," will be executed in the section between the Tzur Natan junction and the Southern Tayibe junction. This section will involve infrastructure and road works, including, but not limited to, widening the road to a dual carriageway with two lanes in each direction, separated by a rigid median. Additionally, two service roads will be paved, one on each side, separated by a sidewalk, along with a parking lane adjacent to the main road.
During the execution of the project, the following works are carried out, among others:
- Road Paving
- Widening the Road to a Dual Carriageway with Two Lanes
- Paving Service Roads on Both Sides of the Highway
- Junction regulation in accordance with road regulation plans and along Road 444 within the city of Tayibe.
- Retaining Walls and Acoustic Walls
- Nahal Evrach Crossing
- Installation of a gravity-fed sewage line and relocation of water mains, including crossings beneath Highway 444.
- Installation of new pipelines and connections to Mekorot Company's water supply system.
- Drainage of the roadway (surface runoff) utilizing an underground culvert system, which incorporates manholes and catch basins for collection.
- Construction of a drainage conduit within the Nahal Evrach crossing segment.
- Landscaping, illumination, earthworks, cast-in-situ piles, lighting infrastructure, electrical systems, traffic signalization, and other related works.