Project Description
Olenik managed and executed the removal of an asbestos-cement layer mixed with soil from the IMI Systems rectangle excavation site, located within the IMI Systems Ramat Hasharon facility.
The removal was performed using specialized heavy equipment, in a careful and controlled manner, sealed within dedicated asbestos packaging, and disposed of at an authorized final destination, while adhering to all procedures required by the Ministry of Environmental Protection.
