Project Description
As part of the Kiryat Ata Metronit project, Olenik is executing advance works for a longitudinal drainage conduit extending 800 meters. Furthermore, preparatory excavations will be carried out for an additional 200 meters of conduit along the section from Mordei HaGetaot Street to the future Tzabar Street.
Additional project elements include earthworks, sub-base and base layers, concrete work, preparation for infrastructure line installation (electricity, communication, water), paving, tiling and curbstone placement, lighting, and both temporary and permanent traffic arrangements.
The works encompassed in this project are part of the advance enabling works for the "Kiryat Ata Metronit – HaTe'ala Street and Eastern Bypass" alignment, which includes a bypass road and a Metronit line spanning approximately 8.5 km up to the Tal Interchange.


