Project to Extend Highway 6 North | Sections 8 and 9

Project to Extend Highway 6 North | Sections 8 and 9

Financial Scope

Client

Project Management Company

Project Description

As part of the project to extend Highway 6 northward, the Olenik Group carried out work to improve accessibility and clear infrastructure in Sections 8 and 9, as part of the preparation of the route for the continued development of transportation infrastructure in the area.

The work included earthwork and excavation, route preparation, pipe laying, and the installation of underground infrastructure, with a focus on horizontal directional drilling (HDD).

The directional drilling method enables the installation of various types of infrastructure, including water and communication lines, through precise underground drilling without the need for open-cut excavation along the entire route. This method provides an engineering solution for complex terrain conditions while minimizing environmental impact and disruption to existing infrastructure.

The project was carried out using specialized drilling equipment, combining advanced engineering capabilities with meticulous coordination between the various stages of work, with the aim of preparing the route for the continued implementation of the road extension project.