Project Description
The project included the execution of shoring, excavation works, and preparation of the staging area for the construction of an internal substation, transformers, and future cable banks.
The station is located in Tel Aviv.
Within the scope of the project, works were carried out including shoring piles in various configurations, installation of permanent ground anchors, construction works, on-site cast concrete works, reinforcement steel, drainage system, electrical conduits, temporary fences and gates, asphalt paving, and slope stabilization and cladding.