Project Description
Execution of temporary preparatory works for double-track railway infrastructure, encompassing bridging works within the eastern railway alignment section adjacent to the Lod Interchange on Highway No. 1, specifically between railway kilometers 105+550 and 106+150.
Within the scope of the project, construction activities were performed on several structures:
Structure No. 1 Construction of a new double-track railway bridge over the "Natuf" stream, approximately 43 meters in length between abutments and approximately 12 meters in width.
Structure No. 2 Construction of a road bridge as a grade separation, approximately 35 meters in length between abutments and approximately 13 meters in width. This includes the elimination of existing railway crossing No. 124, the construction of a road bridge, the paving of a new asphalt agricultural road, and the removal of an existing crossing.
Structure No. 3 Lining / trimming works for the cone of existing Road Bridge No. 1 over the existing railway track. The work includes, among others, the execution of piles of various diameters, concrete slab construction, anchor installation, and temporary lining works.
The project scope encompassed the following works:
Site preparation, demolition, clearing, and excavation works,
Relocation and protection of existing infrastructure and utilities, including through horizontal directional drilling (HDD), construction of reinforced earth walls, bridge abutments, various structures, and other related elements.
Concrete drainage channels, railway communication infrastructure works including longitudinal channels, excavations and preparations for electrical infrastructure, protection of active communication lines, and the construction of railway and road bridges.