Project Description
As part of the project, we executed steel bridge construction works.
The bridge is composed of 3 sections, with a total length of approximately 70 meters.
The bridge was installed on 3 piers, with the end piers made of steel and incorporating open stairwells.
The central pier is constructed from a reinforced concrete column.
The foundations were established using drilled and cast-in-place bentonite piles, along with shoring piles for the protection of communication lines and operational passages.
Additionally, we performed framework, paving, road development, electrical, and communication works.